National Rollout: Close to 800 Stores in Six Weeks
October 29, 2026 •
Delivering a complex national refrigeration rollout across close to 800 Domino's stores in just six weeks.
Coordinating a complex national equipment rollout across hundreds of operating retail locations.
Managing an equipment changeover across hundreds of operating retail locations requires extensive planning, coordination and precision.
For PFM, a recent national project involved delivering new refrigeration equipment and recovering existing assets across close to 800 Domino’s locations throughout Australia.
With just six weeks to complete the transition, the project brought together national transport, specialised equipment handling and reverse logistics, all while adapting to changing requirements across the network.
The Challenge: Managing a Complex National Rollout
Delivering equipment to hundreds of locations within a fixed timeframe presents significant logistical challenges, particularly when those locations need to remain operational throughout the process.
Each store had its own access requirements, delivery conditions and operational considerations. At the same time, equipment needed to move in both directions, with new refrigeration units being delivered and existing assets recovered.
As the rollout progressed, additional complexities emerged. Collection requirements changed, buyback arrangements were introduced, and equipment availability fluctuated.
Regional locations also presented their own logistical challenges, requiring careful coordination of transport, personnel and delivery schedules.
Successfully managing the transition meant having a logistics partner capable of adapting to these changes while maintaining momentum across the broader rollout.
The Solution: National Coordination, Local Execution
PFM worked closely with project stakeholders to coordinate the national transition, combining centralised project management with local operational teams across Australia.
Daily project meetings ensured everyone remained aligned, while stores were contacted ahead of scheduled deliveries to confirm access requirements and minimise disruption.
Delivery routes, crew allocations and equipment requirements were continually reviewed as project volumes and priorities evolved.
In metropolitan areas, morning collections and afternoon delivery runs were coordinated wherever practical to improve efficiency. More complex locations were supported by two-person crews and specialised handling equipment suited to individual site requirements.
This approach allowed PFM to manage the rollout at a national level while responding to the specific needs of each location.

Maintaining Visibility Throughout the Rollout
With hundreds of stores progressing through the project simultaneously, maintaining visibility across the operation was essential.
Beyond the physical movement of equipment, PFM needed to track completed deliveries, outgoing equipment collections, changes to individual store requirements and outstanding activities.
Ongoing communication between project stakeholders and operational teams helped ensure that emerging challenges could be identified and addressed as the rollout progressed.
This level of coordination was particularly important as equipment availability, collection arrangements and delivery priorities continued to change.
The Outcome: One Coordinated National Transition
Over six weeks, PFM teams across Australia supported the refrigeration equipment transition across close to 800 Domino’s locations.
The project involved deploying new equipment while recovering existing assets through the same national network.
While the scale and timeframe were significant, the real achievement was maintaining coordination across multiple stakeholders, locations and changing operational requirements.
The project demonstrates PFM’s capability to manage complex national rollouts, combining project management, specialised transport, equipment handling and reverse logistics within one coordinated operation.
Close to 800 locations. Six weeks. One coordinated transition.